Licensed Condo Renovation Contractor — Metro Vancouver Since 1981

Condo Renovation Vancouver

Kitchen, bathrooms, open-concept conversions, full gut renovations — DELANA Interiors handles every permit, strata application, and trade under one contract.

  • Licensed & insured in BC
  • WorkSafe BC registered
  • Strata-experienced since 1981
  • 2-Year Written Warranty
Renovated open-concept condo kitchen and living area in Vancouver by DELANA Interiors

Renovating a condo in Vancouver is not the same as renovating a house. Before a single wall comes down, you need written strata approval. Before a plumber touches a pipe, you need City permits. Before any trade enters the building, elevator access must be booked, insurance certificates submitted, and noise-hour restrictions confirmed with the building manager. Most contractors are not set up for this. DELANA Interiors has been completing condo renovations across Metro Vancouver since 1981 — we prepare every strata document, pull every City permit, and schedule every trade within approved hours. You hand us the keys. We handle everything else.

What Does a Condo Renovation in Vancouver Include?

A full condo renovation in Vancouver includes kitchen renovation (cabinets, countertops, appliances, plumbing), bathroom renovation (tile, vanity, fixtures), flooring throughout, lighting upgrades, any layout changes, all City permits, strata application preparation and submission, trade scheduling within strata-approved hours, elevator bookings, and a final City inspection. DELANA delivers all of this under one contract with one point of contact.

What is included in our condo renovations:

  • Free in-condo assessment — layout, existing finishes, and strata bylaws reviewed at no charge
  • Detailed itemised written quote before any work begins — strata fees, permit costs, and trade work all included
  • Complete strata renovation application prepared and submitted on your behalf
  • All City of Vancouver building permits pulled and managed
  • Condo kitchen renovation — cabinets, countertops, appliances, plumbing, and electrical
  • Condo bathroom renovation — tile, vanity, fixtures, waterproofing, and pot lighting
  • Open concept conversion — structural engineering coordination and strata submission included
  • Flooring installation with strata-required sound-dampening underlay
  • LED pot lighting throughout — recessed fixtures to BC Electrical Code
  • Elevator booking and corridor protection for all material deliveries
  • All trades scheduled within strata-approved hours — no bylaw violations
  • Final City inspection coordination and 2-year written workmanship warranty

Every condo renovation includes custom cabinetry and millwork built to your exact layout and coordinated flooring installation with proper underlay. See our completed projects or read what Vancouver homeowners say about us.

The Step Most Contractors Skip

Strata Coordination — We Handle Every Document

Most Vancouver condo owners do not realise how much documentation a strata corporation requires before renovation work begins. A typical strata renovation application includes all of the following — and approval takes 1 to 3 weeks from the date of submission.

Documents we prepare and submit for you:

  • Written scope of work describing every trade and material
  • Contractor's BC business licence and registration number
  • WorkSafeBC clearance letter for all trades on site
  • Proof of general liability insurance (most buildings require $2M minimum)
  • City of Vancouver building permit copies (electrical, plumbing, structural)
  • Elevator booking confirmation from building management
  • Agreed work hours schedule (typically 8:00 AM to 5:00 PM weekdays)
  • Signed neighbour notification letter (required in some buildings)

You never visit the strata office. You never communicate with the building manager. You never track down contractor insurance certificates. That is our job — and we have been doing it in strata buildings across Yaletown, Coal Harbour, the West End, Kitsilano, North Vancouver, and West Vancouver since 1981.

Condo renovation in progress in Vancouver — professional framing and rough-in stage by DELANA Interiors

How We Handle Your Condo Renovation in Vancouver

Every condo renovation follows the same structured process — built around strata requirements and building logistics from day one.

  1. Free In-Condo Assessment

    We visit your condo at no cost. We review the layout, assess existing finishes, and discuss your goals. We also review your strata bylaws on the spot so nothing surprises us during the project.

  2. Written Quote — All Costs Disclosed

    You receive a detailed written quote covering all labour, materials, strata fees, permit costs, elevator booking fees, and trade work. Nothing starts until you have approved every line.

  3. Strata Application Submission

    We prepare and submit the complete strata renovation package on your behalf — contractor credentials, WorkSafeBC clearance, insurance certificates, permit copies, and signed scope. Approval typically takes 1 to 3 weeks.

  4. City Permits

    Any condo renovation involving electrical, plumbing, or structural work requires a City of Vancouver building permit. We pull every permit, respond to any City questions, and manage the process entirely.

  5. Construction — Within Strata-Approved Hours

    All trades work under our direct supervision within strata-approved hours (typically 8:00 AM to 5:00 PM weekdays). Elevator access is booked in advance. Corridor protection goes up and comes down daily. One point of contact throughout.

  6. Final Inspection, Walkthrough, and Warranty

    We schedule and pass every required City inspection. We walk the completed project with you, resolve any deficiencies, and hand over your 2-year written workmanship warranty.

Luxury condo kitchen renovation in Vancouver by DELANA Interiors — custom cabinetry and quartz countertops
Renovated Yaletown condo kitchen with navy cabinetry and waterfall quartz island — DELANA Interiors

Why Vancouver Condo Owners Choose DELANA Interiors

  • Strata-Experienced Since 1981

    DELANA Interiors has completed condo renovations in strata buildings across Yaletown, Coal Harbour, the West End, Kitsilano, False Creek, North Vancouver, and West Vancouver for over 40 years. We know how strata boards operate, what building managers require, and how to keep a renovation running without disputes or stop-work notices.

  • We Handle Every Permit and Strata Application

    We prepare and submit the complete strata renovation application, pull every City permit, and manage all inspections. You never deal with the City building department or the strata office. That is part of what you hire us to do.

  • Real Cost Ranges — Not a Vague "Call for Pricing"

    We publish honest cost ranges because informed homeowners make better decisions. A kitchen-only condo renovation runs $25,000–$55,000. A full gut runs $70,000–$120,000. Every estimate is confirmed in writing after a free in-home visit.

  • 2-Year Written Workmanship Warranty

    Every condo renovation DELANA completes comes with a 2-year written workmanship warranty. If anything we built or installed fails within two years, we return and repair it at no charge. No other condo renovation contractor in Metro Vancouver offers this in writing.

  • One Contract — Kitchen, Bathrooms, Flooring, Layout

    Full gut renovation. Kitchen update. Bathroom. Flooring. Open-concept conversion. Whatever the scope, one contract covers everything. One project manager coordinates every trade. No managing multiple contractors. No coordinating your own permits.

How Much Does a Condo Renovation Cost in Vancouver?

Typical cost range

$25,000 – $120,000

Kitchen-only updates start at $25K. Full gut renovations with kitchen, bathrooms, flooring, and layout changes run $70K–$120K. Strata requirements and building logistics typically add 10–15% vs an equivalent house renovation.

Project Type Estimated Cost
Kitchen-only condo renovation $25,000 – $55,000
Bathroom renovation (per bathroom) $15,000 – $35,000
Open concept conversion (structural only) $8,000 – $20,000
Full condo gut (kitchen, bathrooms, flooring, layout) $70,000 – $120,000
Flooring and lighting upgrade (full unit) $15,000 – $30,000

These ranges reflect current Vancouver labour and material costs as of 2026. Strata elevator booking fees, building damage deposits, engineering reports for open-concept conversions, and permit fees are always disclosed in your written quote before work begins.

We do not quote condo renovations from a website. Every estimate is based on a free in-condo visit where we review the space, assess your strata bylaws, and give you a written number you can rely on. Call us at (236) 858-8187 or reach us through our contact page.

How Long Does a Condo Renovation Take in Vancouver?

A full condo renovation in Vancouver takes 4 to 10 weeks from permit approval to final walkthrough. Strata approval adds 1 to 3 weeks before construction begins. City permit processing adds a further 2 to 4 weeks for projects involving electrical, plumbing, or structural changes. Most strata bylaws restrict work to weekdays 8:00 AM to 5:00 PM — we build all of this into the schedule before we start.

Project Type Construction Time Total (incl. strata + permits)
Kitchen-only renovation 3 – 5 weeks 5 – 9 weeks
Bathroom renovation 2 – 4 weeks 4 – 7 weeks
Full gut renovation 6 – 10 weeks 8 – 14 weeks
Open concept conversion (structural only) 1 – 2 weeks 3 – 6 weeks

Noise Hour Restrictions

Most Vancouver strata bylaws restrict construction noise to weekdays 8:00 AM to 5:00 PM. Some buildings restrict Saturdays entirely. All work must comply with the City of Vancouver Noise Control By-law. DELANA reviews your strata bylaws before scheduling any trade — no surprise complaints from neighbours or notices from the strata manager.

Elevator Bookings

Most Vancouver strata buildings require advance elevator booking for renovation material deliveries and debris removal. DELANA books elevator access before each project phase and installs corridor protection during all material movement — building management and neighbours are never inconvenienced.

Recent Condo Renovation Projects

Completed condo renovations across Metro Vancouver.

Yaletown, Vancouver

Full Condo Gut Renovation — Yaletown

Complete gut renovation of a two-bedroom, two-bathroom Yaletown condo. Scope included a full kitchen renovation with custom cabinetry and waterfall quartz island, removal of the kitchen wall for an open-concept conversion, two complete bathroom renovations, engineered hardwood flooring throughout, and full LED pot lighting upgrade. Strata approval obtained in 12 days. Renovation completed in 9 weeks.

Renovated Yaletown condo kitchen — navy lower cabinets and waterfall quartz island by DELANA Interiors

Kitchen — Yaletown

Open-concept living and dining area after condo renovation in Yaletown — DELANA Interiors Vancouver

Open Concept Living — Yaletown

Renovated condo bathroom in Yaletown — large format tile and frameless glass shower by DELANA Interiors

Bathroom — Yaletown

Coal Harbour, Vancouver

Kitchen and Bathroom Package — Coal Harbour

Kitchen and main bathroom renovation in a Coal Harbour high-rise. Custom flat-front cabinetry with panel-ready integrated appliances, Caesarstone countertops, complete bathroom tile replacement, floating vanity, and backlit LED mirror. All work completed within strata-approved hours. Zero strata complaints or violation notices.

Renovated Coal Harbour condo kitchen with integrated appliances and quartz countertops — DELANA Interiors

Kitchen — Coal Harbour

Renovated condo bathroom in Coal Harbour — floating vanity and backlit LED mirror by DELANA Interiors

Bathroom — Coal Harbour

Verified Google Reviews

What Vancouver Homeowners Say About DELANA Interiors

"The team was professional, punctual, and highly skilled. From the initial consultation to the final walkthrough, everything was handled with clear communication and attention to detail. The quality of workmanship exceeded my expectations, and the project was completed on time and within budget."
— Anh Tuan T., Vancouver
"I had a great experience working with Delana Interiors. Great team with years of experience. They done a wonderful job and made sure everything was done right."
— Harmandeep S., Vancouver
"I am so glad that I gave this contract to Delana Interiors. They done a great job. Very professional and the quality of their work is outstanding."
— Harpreet K., Vancouver

A condo renovation often pairs with other services. Here is what we provide across Metro Vancouver:

Common Questions About Condo Renovation in Vancouver

A condo renovation in Vancouver typically costs $25,000–$120,000 depending on scope. A kitchen-only update runs $25,000–$55,000. A full condo gut — kitchen, bathrooms, flooring, and open-concept conversion — ranges $70,000–$120,000. Strata-specific requirements, elevator logistics, and noise-hour restrictions can add 10–15% to the total budget compared to an equivalent house renovation.

Yes. Most strata corporations in Vancouver require written approval before any renovation begins. You must submit a renovation application detailing scope, contractor credentials, trade permits, and proof of insurance. DELANA prepares and submits all strata documentation as part of our project scope — homeowners never deal with the strata office directly.

A full condo renovation takes 4–10 weeks from permit approval to final walkthrough. Strata approval adds 1–3 weeks before work starts. Kitchen-only projects run 3–5 weeks. Full gut renovations with bathroom, kitchen, and flooring take 6–10 weeks. Strata bylaws restricting work to 8am–5pm weekdays affect scheduling, and we build all of this into our project timeline before we start.

Any condo renovation involving electrical, plumbing, or structural changes requires a City of Vancouver building permit under the BC Building Code. Kitchen and bathroom renovations almost always trigger this requirement. DELANA pulls and manages every required permit and coordinates all City inspections — the homeowner is never involved in the permit process.

Yes, but only after confirming with a structural engineer that the wall is non-load-bearing, and after receiving written strata approval. Open-concept conversions in Vancouver condos typically cost $8,000–$20,000 for the structural work alone, not including the surrounding kitchen or flooring renovation. DELANA coordinates engineering assessments and strata submissions as part of our design-build process.

Most Vancouver strata bylaws restrict construction to weekdays 8:00 AM to 5:00 PM. Some buildings restrict or prohibit Saturday work. All construction must also comply with the City of Vancouver Noise Control By-law. DELANA reviews your strata bylaws before scheduling any trade and builds the noise hour restrictions into the project schedule from day one.

A full condo renovation covers kitchen (cabinets, countertops, appliances, plumbing rough-in), bathrooms (tile, vanity, fixtures, waterproofing), flooring throughout, lighting upgrades, and any layout changes. It includes all permits, strata application preparation, trade scheduling within approved hours, elevator bookings, and a final City inspection. DELANA delivers everything under one contract with one point of contact.

Verify BC contractor licensing through BC Housing's Homeowner Protection registry, confirm WorkSafeBC registration, and request proof of general liability insurance before signing any contract. DELANA Interiors has held all required BC contractor licensing continuously since 1981 and provides documentation on request. We are also WorkSafeBC registered and carry full general liability coverage.

Ready to start your condo renovation in Vancouver?

Call us for a free visit to your condo. We review the space, check your strata bylaws, and give you a written quote — no obligation. Monday to Friday 7:00 AM to 6:00 PM, Saturday 9:00 AM to 2:00 PM.

Call Now — (236) 858-8187
1310 Sinclair Street, West Vancouver, BC Serving Vancouver · Burnaby · North Vancouver · West Vancouver · Shaughnessy