# 2026 Vancouver Tenant Improvement Budget Checklist Use this checklist before signing a commercial lease or approving a tenant improvement quote in Metro Vancouver. ## Lease and allowance questions - What is the tenant improvement allowance per square foot? - Is the allowance paid upfront, reimbursed after completion, or credited through rent? - Does the allowance include design, engineering, permits, IT, security, signage, furniture, fixtures, and equipment? - Does the landlord require a preferred contractor? - What restoration work does the lease require when you leave? ## Shell condition checks - Is the space a warm shell, cold shell, vanilla shell, or previously occupied unit? - Are washrooms already in place and code-compliant for the new use? - Is the electrical panel large enough? - Are existing HVAC zones suitable for the new layout? - Does the sprinkler layout work with the new room plan? - Are there hazardous materials or asbestos risks? ## Permit and municipality checks - Which municipality reviews the permit? - Does the work qualify for a faster tenant-improvement stream? - Does the use trigger a change of occupancy? - Do you need plumbing, electrical, sprinkler, fire alarm, gas, or mechanical permits? - Who is responsible for booking inspections? ## Quote line items to request - Demolition and disposal - Framing, drywall, doors, frames, and hardware - Flooring, paint, and finishes - Millwork and counters - Plumbing, electrical, mechanical, sprinklers, and fire alarm - Data, security, and AV rough-ins - Permit coordination and inspections - General conditions, site protection, clean-up, and contingency