Basement rental suite — quote comparison worksheet

Property: ____________________ Agreed floor plan / drawing date: ____________________ Quote dates: ____________________

For each contractor, record included, excluded, a stated allowance, or separately quoted. Ask for written clarification where the quote is silent.

ItemContractor AContractor BQuestion / answer
Construction and finishing
Basic layout drawings
Permit drawings
Building and relevant trade permit fees
Existing work assessed for reuse
Plumbing and electrical changes
Required fire separation and safety work
Cabinet plan and construction materials
Countertops, flooring and tile
Bathroom fittings and fixtures
Heating and ventilation
Light fixtures
Appliances
Window coverings
Identified existing-condition work
Taxes and allowances
Payment and change-approval terms
Start date / construction period
Permit waiting / approval responsibilities
Inspection coordination

Clarifications still needed: ____________________

Check before signing:

This worksheet compares scope. It does not calculate a complete project price or establish compliance. Confirm property requirements through the City of Vancouver: https://vancouver.ca/home-property-development/creating-a-secondary-suite.aspx .

DELANA Interiors — request a free in-home consultation: https://delanainteriors.ca/contact/ .