Property: ____________________ Agreed floor plan / drawing date: ____________________ Quote dates: ____________________
For each contractor, record included, excluded, a stated allowance, or separately quoted. Ask for written clarification where the quote is silent.
| Item | Contractor A | Contractor B | Question / answer |
|---|---|---|---|
| Construction and finishing | |||
| Basic layout drawings | |||
| Permit drawings | |||
| Building and relevant trade permit fees | |||
| Existing work assessed for reuse | |||
| Plumbing and electrical changes | |||
| Required fire separation and safety work | |||
| Cabinet plan and construction materials | |||
| Countertops, flooring and tile | |||
| Bathroom fittings and fixtures | |||
| Heating and ventilation | |||
| Light fixtures | |||
| Appliances | |||
| Window coverings | |||
| Identified existing-condition work | |||
| Taxes and allowances | |||
| Payment and change-approval terms | |||
| Start date / construction period | |||
| Permit waiting / approval responsibilities | |||
| Inspection coordination |
Clarifications still needed: ____________________
Check before signing:
This worksheet compares scope. It does not calculate a complete project price or establish compliance. Confirm property requirements through the City of Vancouver: https://vancouver.ca/home-property-development/creating-a-secondary-suite.aspx .
DELANA Interiors — request a free in-home consultation: https://delanainteriors.ca/contact/ .